Version: 2024.08
Loading Scheme...
CPC | COOPERATIVE PATENT CLASSIFICATION | ||||||
| E02D | FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)} [2021-01] NOTES
WARNINGS
|
E02D 1/00 | Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00, E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N, e.g. sampling G01N 1/00) [2013-01] |
E02D 1/02 | . | before construction work [2013-01] |
E02D 1/022 | . . | {by investigating mechanical properties of the soil (E02D 1/027 takes precedence)} [2013-01] |
E02D 1/025 | . . . | {combined with sampling} [2013-01] |
E02D 1/027 | . . | {by investigating properties relating to fluids in the soil, e.g. pore-water pressure, permeability (sampling of groundwater E02D 1/06)} [2013-01] |
E02D 1/04 | . . |
E02D 1/06 | . . | Sampling of ground water [2013-01] |
E02D 1/08 | . |
E02D 3/00 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/20; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/10; setting rock anchoring bolts E21D) [2013-01] |
E02D 3/005 | . | {Soil-conditioning by mixing with fibrous materials, filaments, open mesh or the like} [2013-01] |
E02D 3/02 | . | Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) [2013-01] |
E02D 3/026 | . . | by rolling with rollers usable only for or specially adapted for soil compaction, e.g. sheepsfoot rollers (rollers for soil working in agriculture A01B 29/00; rollers for road paving, such rollers usable also for compacting soil E01C 19/23) [2013-01] |
E02D 3/0265 | . . . | {Wheels specially adapted therefor; Cleats for said wheels} [2013-01] |
E02D 3/032 | . . . | Trench rollers [2013-01] |
E02D 3/039 | . . . | Slope rollers [2013-01] |
E02D 3/046 | . . | by tamping or vibrating, e.g. with auxiliary watering of the soil (E02D 3/026, E02D 3/08 take precedence; generating or transmitting mechanical vibrations for performing mechanical work in general B06B; tamping or vibrating apparatus for working ballast or railways E01B 27/00, for consolidating paving materials E01C 19/30, for consolidating concrete in general E04G 21/06) [2013-01] |
E02D 3/054 | . . . | involving penetration of the soil, e.g. vibroflotation [2013-01] |
E02D 3/061 | . . . | Tampers with directly acting explosion chambers (pile drivers with explosion chambers E02D 7/12) [2013-01] |
E02D 3/068 | . . . | Vibrating apparatus operating with systems involving reciprocating masses (E02D 3/054, E02D 3/061 take precedence) [2013-01] |
E02D 3/074 | . . . | Vibrating apparatus operating with systems involving rotary unbalanced masses (E02D 3/054 takes precedence) [2013-01] |
E02D 3/08 | . . | by inserting stones or lost bodies, e.g. compaction piles (sand drains for soil compaction E02D 3/10; stressing soil while forming foundations E02D 27/28) [2013-01] |
E02D 3/10 | . . | by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains (E02D 3/11 takes precedence; soil-penetrating vibrators with auxiliary watering E02D 3/054; drainage of soil in general E02B 11/00) [2013-01] |
E02D 3/103 | . . . | {by installing wick drains or sand bags} [2013-01] |
E02D 3/106 | . . . | {by forming sand drains containing only loose aggregates (sand piles E02D 3/08)} [2013-01] |
E02D 3/11 | . | by thermal, electrical or electro-chemical means (freezing soil for interrupting passage of underground water E02D 19/14) [2013-01] |
E02D 3/115 | . . | by freezing [2013-01] |
E02D 3/12 | . | Consolidating by placing solidifying or pore-filling substances in the soil (making piles E02D 5/46; soil-conditioning or soil-stabilising materials C09K 17/00; consolidation of ground around boreholes or wells E21B 43/025) [2013-01] |
E02D 3/123 | . . | {and compacting the soil (E02D 3/126 takes precedence)} [2013-01] |
E02D 3/126 | . . | {and mixing by rotating blades} [2013-01] |
E02D 5/00 | Bulkheads, piles, or other structural elements specially adapted to foundation engineering (engineering elements in general F16) [2013-01] |
E02D 5/02 | . | Sheet piles or sheet pile bulkheads {(foundations made with sheet pile bulkheads E02D 27/30; cofferdams E02D 19/04)} [2013-01] |
E02D 5/03 | . . | Prefabricated parts {, e.g. composite sheet piles} [2016-08] |
E02D 5/04 | . . . | made of steel [2013-01] |
E02D 5/06 | . . . . | Fitted piles or other elements specially adapted for closing gaps between two sheet piles or between two walls of sheet piles [2013-01] |
E02D 5/08 | . . . . | Locking forms; Edge joints; Pile crossings; Branch pieces [2013-01] |
E02D 5/10 | . . . |
E02D 5/105 | . . . . | {of prestressed concrete (E02D 5/12 takes precedence)} [2013-01] |
E02D 5/12 | . . . . | Locking forms; Edge joints; Pile crossings; Branch pieces [2013-01] |
E02D 5/14 | . . | Sealing joints between adjacent {sheet} piles (sealing joints not restricted to foundation piles E04B 1/68) [2013-01] |
E02D 5/16 | . . | Auxiliary devices rigidly or detachably arranged on sheet piles for facilitating assembly {(as parts of driving or pulling apparatus E02D 7/00, E02D 13/00)} [2013-01] |
E02D 5/18 | . | Bulkheads or similar walls made solely of concrete in situ {(moulds therefor E02D 5/68; making foundation slots E02D 17/13; sealing diaphragms other than those made of concrete E02D 19/18)} [2013-01] |
E02D 5/182 | . . | {using formworks to separate sections} [2013-01] |
E02D 5/185 | . . | {with flexible joint members between sections (joints in foundation structures E02D 29/16; flexible joints in hydraulic engineering E02B 3/16, in building E04B 1/68)} [2013-01] |
E02D 5/187 | . . | {the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints} [2013-01] |
E02D 5/20 | . | Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ [2013-01] |
E02D 5/22 | . | Piles (sheet piles, {i.e. elements shaped to mutually lock or mate} E02D 5/02; {pile shoes E02D 5/72; foundations on piles E02D 27/12, E02D 27/20}) [2013-01] |
E02D 5/223 | . . | {Details of top sections of foundation piles (E02D 5/54 takes precedence)} [2013-01] |
E02D 5/226 | . . | {Protecting piles (piles with protecting cases E02D 5/60)} [2013-01] |
| E02D 5/24 | . . |
E02D 5/26 | . . . |
E02D 5/28 | . . . |
E02D 5/285 | . . . . | {tubular, e.g. prefabricated from sheet pile elements (sheet pile boxes E02D 27/30; concrete piles with metal casings E02D 5/30)} [2013-01] |
E02D 5/30 | . . . | made of concrete or reinforced concrete or made of steel and concrete {(E02D 5/50 takes precedence; assembled from segments E02D 5/523; prestressed concrete E02D 5/58)} [2013-01] |
E02D 5/32 | . . . | with arrangements for setting {or assisting in setting} in position by fluid jets {(placing piers by using fluid jets in general E02D 7/24)} [2013-01] |
E02D 5/34 | . . | Concrete or concrete-like piles cast in position {; Apparatus for making same (E02D 5/50 takes precedence; moulds E02D 5/665; placing, removing moulds E02D 7/00 - E02D 11/00; placing the concrete E02D 15/04)} [2017-08] |
E02D 5/36 | . . . | making without use of mouldpipes or other moulds [2021-01] |
E02D 5/38 | . . . | making by use of mould-pipes or other moulds [2013-01] |
E02D 5/385 | . . . . |
E02D 5/40 | . . . . | in open water [2013-01] |
E02D 5/42 | . . . . | by making use of pressure liquid or pressure gas for compacting the concrete [2013-01] |
E02D 5/44 | . . . . | with enlarged footing or enlargements at the bottom of the pile [2013-01] |
E02D 5/445 | . . . . . | {by application of pyrotechniques} [2013-01] |
E02D 5/46 | . . . | making in situ by forcing bonding agents into gravel fillings or the soil (consolidating soil in general E02D 3/12) [2013-01] |
E02D 5/48 | . . |
E02D 5/50 | . . | Piles comprising both precast concrete portions and concrete portions cast in situ {(E02D 5/523 takes precedence)} [2013-01] |
E02D 5/52 | . . | Piles composed of separable parts, e.g. telescopic tubes {; Piles composed of segments} [2023-08] |
E02D 5/523 | . . . | {composed of segments} [2013-01] |
E02D 5/526 | . . . . | {Connection means between pile segments} [2013-01] |
E02D 5/54 | . . | Piles with prefabricated supports or anchoring parts; Anchoring piles {(E02D 5/44 takes precedence; ground anchors E02D 5/80; anchored foundations E02D 27/50)} [2013-01] |
E02D 5/56 | . . |
E02D 5/58 | . . |
E02D 5/60 | . . | Piles with protecting cases [2013-01] |
E02D 5/62 | . . | Compacting the soil at the footing or in {or along} a casing by forcing cement or like material through tubes [2013-01] |
E02D 5/64 | . . | Repairing piles [2013-01] |
E02D 5/66 | . |
E02D 5/665 | . . | {for making piles} [2013-01] |
E02D 5/68 | . . | for making bulkheads or elements thereof [2013-01] |
E02D 5/70 | . . | for making sheet piles {not used} [2013-01] |
E02D 5/72 | . | Pile shoes [2013-01] |
E02D 5/74 | . | Means for anchoring structural elements or bulkheads (anchoring piles E02D 5/54 {; anchored foundations E02D 27/50}) [2017-08] |
E02D 5/76 | . . | Anchorings for bulkheads or sections thereof {in as much as specially adapted therefor} [2017-08] |
E02D 5/765 | . . . | {removable} [2013-01] |
E02D 5/80 | . . |
E02D 5/801 | . . . | {driven by screwing} [2013-01] |
E02D 5/803 | . . . | {with pivotable anchoring members} [2013-01] |
E02D 5/805 | . . . | {with deformable anchoring members} [2013-01] |
E02D 5/806 | . . . | {involving use of explosives} [2013-01] |
E02D 5/808 | . . . | {anchored by using exclusively a bonding material} [2013-01] |
E02D 7/00 | Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds (for both placing and removing E02D 11/00; {accessories for coupling driver to piles or the like E02D 13/10; for trees or other plants A01G 17/16; placing posts E04H 17/26}) [2013-01] |
E02D 7/02 | . |
E02D 7/04 | . . | Hand {(-actuated)} pile-drivers [2013-01] |
E02D 7/06 | . . |
E02D 7/08 | . . . |
E02D 7/10 | . . . |
E02D 7/12 | . . . | Drivers with explosion chambers [2013-01] |
E02D 7/125 | . . . . | {Diesel drivers} [2013-01] |
E02D 7/14 | . . . | Components for drivers {inasmuch as not specially for a specific driver construction} [2013-01] |
E02D 7/16 | . . . . | Scaffolds {or supports} for drivers {(guide frames for the elements to be driven per se E02D 13/04; supports of the artificial island type E02B 17/00)} [2013-01] |
E02D 7/165 | . . . . . | {of variable length, e.g. foldable or telescopic} [2013-01] |
E02D 7/18 | . |
E02D 7/20 | . | Placing by pressure or pulling power [2013-01] |
E02D 7/22 | . |
E02D 7/24 | . | Placing by using fluid jets {(prefabricated concrete piles with arrangements therefor E02D 5/32)} [2013-01] |
E02D 7/26 | . | Placing by using several means simultaneously [2013-01] |
E02D 7/28 | . | Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes {(E02D 13/08 takes precedence)} [2013-01] |
E02D 7/30 | . . | by driving cores [2013-01] |
E02D 9/00 | Removing sheet piles bulkheads, piles, mould-pipes or other moulds {or parts thereof}(for both placing and removing E02D 11/00) [2013-01] |
E02D 9/005 | . | {removing the top of placed piles of sheet piles (E02D 9/04 takes precedence)} [2013-01] |
E02D 9/02 | . | by withdrawing [2013-01] |
E02D 9/04 | . | by cutting-off under water [2013-01] |
E02D 11/00 | Methods or apparatus {specially adapted} for both placing and removing sheet pile bulkheads, piles, or mould-pipes (features relating to placing only E02D 7/00, to removing only E02D 9/00 {; placing apparatus which without special provisions, can be operated to remove, e.g. vibrating drivers E02D 7/00}) [2017-08] |
E02D 13/00 | Accessories for placing or removing piles or bulkheads {, e.g. noise attenuating chambers} [2017-08] |
E02D 13/005 | . | {Sound absorbing accessories in piling} [2013-01] |
E02D 13/02 | . | specially adapted for placing or removing bulkheads [2013-01] |
E02D 13/04 | . |
E02D 13/06 | . | for observation while placing [2013-01] |
E02D 13/08 | . | Removing obstacles [2013-01] |
| E02D 13/10 | . | Follow-blocks of pile-drivers or like devices [2013-01] NOTE
|
E02D 15/00 | Handling building or like materials for hydraulic engineering or foundations ({soil-shifting E02F;} conveying or working-up concrete or similar masses in general E04G 21/02) [2013-01] |
E02D 15/02 | . | Handling of bulk concrete specially for foundation {or hydraulic engineering} purposes {(lining canals E02B 5/02; banks of the bodies of water E02B 3/121)} [2013-01] |
E02D 15/04 | . . | Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts [2013-01] |
E02D 15/06 | . . |
E02D 15/08 | . | Sinking workpieces into water or soil {inasmuch as not provided for elsewhere} [2013-01] |
E02D 15/10 | . | Placing gravel or light material under water {inasmuch as not provided for elsewhere} [2013-01] |
E02D 17/00 |
E02D 17/02 | . | Foundation pits [2013-01] |
E02D 17/04 | . . | Bordering {surfacing} or stiffening the sides of foundation pits [2013-01] |
E02D 17/06 | . | Foundation {trenches} ditches or narrow shafts [2013-01] |
E02D 17/08 | . . | Bordering or stiffening the sides of ditches {trenches} or narrow shafts for foundations [2013-01] |
E02D 17/083 | . . . | {Shoring struts} [2013-01] |
E02D 17/086 | . . . | {Travelling trench shores} [2013-01] |
E02D 17/10 | . . | Covering trenches for foundations [2013-01] |
E02D 17/12 | . . |
E02D 17/13 | . | Foundation slots {or slits}; Implements for making these slots {or slits} [2013-01] |
E02D 17/16 | . |
E02D 17/18 | . | Making embankments, {e.g. dikes, dams}(E02D 17/20 takes precedence; {foundations for dams E02D 27/40}) [2013-01] |
E02D 17/20 | . | Securing of slopes or inclines {(by soil E02D 3/12; protection against snowslides or avalanches E01F 7/04, E01F 15/00; securing banks or like surfaces facing on bodies of water E02B 3/12)} [2013-01] |
E02D 17/202 | . . | {with flexible securing means} [2013-01] |
E02D 17/205 | . . | {with modular blocks, e.g. pre-fabricated} [2013-01] |
E02D 17/207 | . . | {with means incorporating sheet piles or piles} [2013-01] |
E02D 19/00 | Keeping dry foundation sites or other areas in the ground (sheet piles or bulkheads E02D 5/02) [2013-01] |
E02D 19/02 | . | Restraining of open water [2013-01] |
E02D 19/04 | . . |
E02D 19/06 | . | Restraining of underground water [2013-01] |
E02D 19/08 | . . | by employing open ditches arranged below the level of the water [2013-01] |
E02D 19/10 | . . | by lowering level of ground water {(installation for obtaining or collecting drinking water E03B 3/00)} [2013-01] |
E02D 19/12 | . . | by damming or interrupting the passage of underground water [2013-01] |
E02D 19/14 | . . . |
E02D 19/16 | . . . | by placing or applying sealing substances ({E02D 19/18 takes precedence}; consolidating by placing solidifying or pore-filling pore-filling substances in the soil E02D 3/12 {; improving soil by chemical substances C09K 17/00}) [2017-08] |
E02D 19/18 | . . . |
E02D 19/185 | . . . . | {Joints between sheets constituting the sealing aprons} [2013-01] |
E02D 19/20 | . . . |
E02D 19/22 | . | Lining sumps in trenches {or other foundation pits} [2013-01] |
E02D 23/00 | Caissons; Construction or placing of caissons (tunnels submerged into or built in open water E02D 29/063 {; moles, piers, quays, breakwaters incorporating caissons E02B 3/06; foundation formed by caissons E02D 27/18 - E02D 27/22; caisson-like artificial islands E02B 17/00}) [2017-08] |
E02D 23/02 | . | Caissons able to be floated on water and to be lowered into water in situ {(floating caisson foundations E02D 27/06)} [2013-01] |
E02D 23/04 | . |
E02D 23/06 | . . | Bringing persons or material into or out of compressed air caissons {(air locks in mines E21F 1/14)} [2017-08] |
E02D 23/08 | . |
E02D 23/10 | . . |
E02D 23/12 | . . | Inclined lowering [2017-08] |
E02D 23/14 | . . | Decreasing the skin friction while lowering [2013-01] |
E02D 23/16 | . | Jointing caissons to the foundation soil, specially to uneven foundation soil [2013-01] |
E02D 25/00 | Joining caissons, sinkers, or other units to each other under water [2013-01] |
E02D 27/00 | Foundations as substructures [2013-01] |
E02D 27/01 | . | Flat foundations [2013-01] |
E02D 27/013 | . . | {Shuttering specially adapted therefor} [2013-01] |
E02D 27/016 | . . | {made mainly from prefabricated concrete elements} [2013-01] |
E02D 27/02 | . . |
E02D 27/04 | . . | in water or on quicksand [2013-01] |
E02D 27/06 | . . . | Floating caisson foundations [2013-01] |
E02D 27/08 | . . |
E02D 27/10 | . | Deep foundations [2013-01] |
E02D 27/12 | . . | Pile foundations [2013-01] |
E02D 27/14 | . . . | Pile framings {, i.e. piles assembled to form the substructure} [2017-08] |
E02D 27/16 | . . . | Foundations formed of separate piles [2013-01] |
E02D 27/18 | . . | Foundations formed by making use of caissons [2013-01] |
E02D 27/20 | . . | Caisson foundations combined with pile foundations [2013-01] |
E02D 27/22 | . . | Caisson foundations made by starting from fixed or floating artificial islands by using protective bulkheads [2013-01] |
E02D 27/24 | . | Foundations constructed by making use of diving-bells (equipment for dwelling or working under water B63C 11/00) [2013-01] |
E02D 27/26 | . |
E02D 27/28 | . | Stressing the soil or the foundation structure while forming foundations [2013-01] |
E02D 27/30 | . | Foundations made with permanent use of sheet pile bulkheads, walls of planks, or sheet piling boxes [2013-01] |
E02D 27/32 | . |
E02D 27/34 | . . | Foundations for sinking or earthquake territories (building constructions with protection arrangements against earthquakes E04H 9/02) [2013-01] |
E02D 27/35 | . . | Foundations formed in frozen ground, e.g. in permafrost soil [2017-08] |
E02D 27/36 | . . | Foundations formed in moors or bogs [2013-01] |
E02D 27/38 | . . | Foundations for large tanks, e.g. oil tanks [2013-01] |
E02D 27/40 | . . |
E02D 27/42 | . . | Foundations for poles, masts or chimneys {(sockets or holders for poles or masts per se E04H 12/22)} [2013-01] |
E02D 27/425 | . . . | {specially adapted for wind motors masts (wind motors per se F03D 1/00)} [2013-01] |
E02D 27/44 | . . | Foundations for machines, engines or ordnance (special layout of foundations with respect to machinery to be supported F16M 9/00) [2017-08] |
E02D 27/46 | . . | Foundations for supply conduits or other canals {(bridges for supporting conduits E01D 18/00; elevated canals E02B 5/005; penstocks E02B 9/06)} [2013-01] |
E02D 27/48 | . . | Foundations inserted underneath existing buildings or constructions {(making a new substructure subsequent to lifting or moving of buildings E04G 23/06)} [2013-01] |
E02D 27/50 | . . | Anchored foundations [2013-01] |
E02D 27/52 | . . | Submerged foundations {, i.e. submerged in open water (E02D 27/12 - E02D 27/24 take precedence)} [2017-08] |
E02D 27/525 | . . . | {using elements penetrating the underwater ground (sinking work pieces E02D 15/08, sinking caissons E02D 23/02)} [2013-01] |
E02D 29/00 | {Independent} underground or underwater structures (underground tanks B65D 88/76; hydraulic engineering, e.g. sealings or joints, E02B; underground garages E04H 6/00; underground air-raid shelters E04H 9/12; burial vaults E04H 13/00); Retaining walls [2013-01] |
E02D 29/02 | . |
E02D 29/0208 | . . | {Gabions} [2013-01] |
E02D 29/0216 | . . | {Cribbing walls} [2013-01] |
E02D 29/0225 | . . | {comprising retention means in the backfill} [2013-01] |
E02D 29/0233 | . . . | {the retention means being anchors (details of anchors E02D 5/80)} [2013-01] |
E02D 29/0241 | . . . | {the retention means being reinforced earth elements} [2013-01] |
E02D 29/025 | . . | {made up of similar modular elements stacked without mortar} [2013-01] |
E02D 29/0258 | . . | {characterised by constructional features} [2019-08] |
E02D 29/0266 | . . . | {made up of preformed elements} [2013-01] |
E02D 29/0275 | . . . | {cast in situ} [2013-01] |
E02D 29/0283 | . . . | {of mixed type} [2013-01] |
E02D 29/0291 | . . . | {made up of filled, bag-like elements} [2013-01] |
E02D 29/04 | . | {Making large underground spaces, e.g. for underground plants, e.g. stations of underground railways; Construction or layout thereof (E02D 29/10 takes precedence; water-supply or sewerage plants E03; layout of water power plants E02B 9/00; making large underground chambers by underground methods only E21D 13/00)} [2016-11] |
E02D 29/045 | . | Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them [2013-01] |
E02D 29/05 | . . | at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench [2013-01] |
E02D 29/055 | . . . | further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel [2013-01] |
E02D 29/06 | . | {Constructions, or methods of constructing, in water (E02D 15/00 takes precedence; submerged foundations E02D 27/52)} [2016-11] |
E02D 29/063 | . | Tunnels submerged into, or built in, open water (construction or placing of caissons in general E02D 23/00; joining caissons to each other under water, in general E02D 25/00) [2013-01] |
E02D 29/067 | . . | Floating tunnels; Submerged bridge-like tunnels, i.e. tunnels supported by piers or the like above the water-bed (pontoons or floating bridges E01D 15/14) [2013-01] |
E02D 29/07 | . . | Tunnels or shuttering therefor preconstructed as a whole or continuously made, and moved into place on the water-bed, e.g. into a preformed trench [2013-01] |
E02D 29/073 | . . | Tunnels or shuttering therefor assembled from sections individually sunk onto, or laid on, the water-bed, e.g. in a preformed trench (caisson-type sections lowered onto the water-bed E02D 29/077) [2013-01] |
E02D 29/077 | . . | Tunnels at least partially built beneath the water-bed characterised by being made by methods involving disturbance thereof all along the location line, e.g. by cut-and-cover or caisson methods [2013-01] |
E02D 29/08 | . | {Siphons (for sewerage E03F 5/20; siphon weirs E02B 7/18; siphons in general F04F 10/00)} [2016-11] |
E02D 29/10 | . | {Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes (for pressure water conduits E02B 9/06; for cables H02G 9/02; layout of tunnels or galleries in general E21D 9/14; road kerbs with housings for pipes or the like E01C 11/222); Making conduits in situ, e.g. of concrete (combined with digging of trenches or ditches E02F 5/10; making or lining tunnels or galleries E21D; constructing tunnels or galleries in open excavations E02D 29/045; in open water E02D 29/063); Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells (wells for drinking water E03B 3/08; boreholes or wells formed by deep drilling E21B; shafts E21D)} [2016-11] |
E02D 29/12 | . | Manhole shafts; Other inspection or access chambers; Accessories therefor (for underground tanks B65D 90/10; for sewerage E03F 5/02 {; climbing irons or ladders E06C 9/00}) [2017-08] |
E02D 29/121 | . . | {characterised by the connection between shaft elements, e.g. of rings forming said shaft} [2013-01] |
E02D 29/122 | . . | {Steps or handrails for shafts} [2013-01] |
E02D 29/124 | . . | {Shaft entirely made of synthetic material} [2013-01] |
E02D 29/125 | . . | {characterised by the lining of the shaft} [2013-01] |
E02D 29/127 | . . | {with devices for impeding fall or injuries of persons} [2013-01] |
E02D 29/128 | . . | {Repairs of manhole shafts} [2013-01] |
E02D 29/14 | . . |
E02D 29/1409 | . . . | {adjustable in height or inclination} [2013-01] |
E02D 29/1418 | . . . | {with implements to assist in lifting, e.g. counterweights, springs (lifting devices for covers B66F 19/005)} [2013-01] |
E02D 29/1427 | . . . | {Locking devices (of bayonet type E02D 29/14)} [2013-01] |
E02D 29/1436 | . . . | {with overflow or explosion control means, e.g. check or relief valves} [2013-01] |
E02D 29/1445 | . . . | {Tools for positioning or removing cover frames} [2013-01] |
E02D 29/1454 | . . . | {Non-circular covers, e.g. hexagonal, elliptic} [2013-01] |
E02D 29/1463 | . . . | {Hinged connection of cover to frame} [2013-01] |
E02D 29/1472 | . . . | {Cover entirely made of synthetic material} [2013-01] |
E02D 29/1481 | . . . | {Security devices, e.g. indicating unauthorised opening (E02D 29/1427 takes precedence)} [2013-01] |
E02D 29/149 | . . . | {Annular gaskets} [2013-01] |
E02D 29/16 | . |
E02D 31/00 | Protective arrangements for foundations or foundation structures {(protective casings for piles E02D 5/60)}; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution (spillage retaining means for tanks B65D 90/24) [2013-01] |
E02D 31/002 | . | {Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution (not used, see subgroups and E02D 31/00)} [2013-01] |
E02D 31/004 | . . | {Sealing liners} [2013-01] |
E02D 31/006 | . . | {Sealing of existing landfills, e.g. using mining techniques} [2013-01] |
E02D 31/008 | . | {against entry of noxious gases, e.g. Radon} [2013-01] |
E02D 31/02 | . | against ground humidity or ground water {(E02D 31/06 takes precedence; arrangements other than according to E02D 31/04; against hydraulic pressure of groundwater E02D 31/10)} [2013-01] |
E02D 31/025 | . . | {Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples} [2013-01] |
E02D 31/04 | . . |
E02D 31/06 | . | against corrosion by soil or water [2013-01] |
E02D 31/08 | . | against transmission of vibrations or movements in the foundation soil {(E02D 27/34 takes precedence; foundations for machines, engines or ordnance E02D 27/44; for road foundations E01C 3/06)} [2013-01] |
E02D 31/10 | . | against soil pressure or hydraulic pressure {(anchored foundations E02D 27/50; joint sealings for use under hydraulic pressure E02D 31/04)} [2013-01] |
E02D 31/12 | . . | against upward hydraulic pressure [2013-01] |
E02D 31/14 | . . | against frost heaves in soil [2013-01] |
E02D 33/00 |
E02D 35/00 | Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations {(foundations for sinking territories with incorporated means for remedying settlement E02D 27/34; lifting or moving buildings E04G 23/06)} [2013-01] |
E02D 35/005 | . | {Lowering or lifting of foundation structures} [2013-01] |
E02D 37/00 | Repair of damaged foundations or foundation structures {(renewing piles E02D 5/64; roads E01C 11/005; bridges E01D 22/00; repairing buildings E04G 23/02)} [2013-01] |
E02D 2200/00 | Geometrical or physical properties [2013-01] |
E02D 2200/11 | . | Height being adjustable [2013-01] |
E02D 2200/115 | . . | with separate pieces [2013-01] |
E02D 2200/12 | . | corrugated [2013-01] |
E02D 2200/13 | . | having at least a mesh portion [2013-01] |
E02D 2200/14 | . | resilient or elastic [2013-01] |
E02D 2200/143 | . . | helically or spirally shaped [2013-01] |
E02D 2200/146 | . . | Springs [2013-01] |
E02D 2200/15 | . | including at least a hinge [2013-01] |
E02D 2200/16 | . | Shapes [2013-01] |
E02D 2200/1607 | . . | round, e.g. circle [2013-01] |
E02D 2200/1614 | . . . | made from single element [2013-01] |
E02D 2200/1621 | . . . | made from multiple elements [2013-01] |
E02D 2200/1628 | . . | rectangular [2013-01] |
E02D 2200/1635 | . . . | made from single element [2013-01] |
E02D 2200/1642 | . . . | made from multiple elements [2013-01] |
E02D 2200/165 | . . | polygonal [2013-01] |
E02D 2200/1657 | . . . | made from single element [2013-01] |
E02D 2200/1664 | . . . | made from multiple elements [2013-01] |
E02D 2200/1671 | . . | helical or spiral [2013-01] |
E02D 2200/1678 | . . | triangular [2013-01] |
E02D 2200/1685 | . . | cylindrical [2013-01] |
E02D 2200/1692 | . . | conical or convex [2013-01] |
E02D 2200/17 | . | including an electric conductive element [2013-01] |
E02D 2220/00 | Temporary installations or constructions [2013-01] |
E02D 2250/00 | Production methods [2013-01] |
E02D 2250/0007 | . | using a mold [2013-01] |
E02D 2250/0015 | . | using extrusion [2013-01] |
E02D 2250/0023 | . | Cast, i.e. in situ or in a mold or other formwork [2013-01] |
E02D 2250/003 | . | Injection of material [2013-01] |
E02D 2250/0038 | . | using an auger, i.e. continuous flight type [2013-01] |
E02D 2250/0046 | . | using prestressing techniques [2013-01] |
E02D 2250/0053 | . | using suction or vacuum techniques [2013-01] |
E02D 2250/0061 | . | for working underwater [2013-01] |
E02D 2250/0069 | . . | Welding [2013-01] |
E02D 2250/0076 | . . | Drilling [2013-01] |
E02D 2250/0084 | . . | using pneumatical means [2013-01] |
E02D 2250/0092 | . . | using hydraulical means [2013-01] |
E02D 2300/00 | Materials [2013-01] |
E02D 2300/0001 | . | Rubbers [2013-01] |
E02D 2300/0003 | . . | Car tires [2013-01] |
E02D 2300/0004 | . | Synthetics [2013-01] |
E02D 2300/0006 | . . | Plastics [2013-01] |
E02D 2300/0007 | . . . | PVC [2013-01] |
E02D 2300/0009 | . . . | PE [2013-01] |
E02D 2300/001 | . . . | PP [2013-01] |
E02D 2300/0012 | . . . | recycled [2013-01] |
E02D 2300/0014 | . . . | PU [2013-01] |
E02D 2300/0015 | . . . | HDPE [2013-01] |
E02D 2300/0017 | . . . | thermoplastic [2013-01] |
E02D 2300/0018 | . . | Cement used as binder [2013-01] |
E02D 2300/002 | . . . | Concrete [2013-01] |
E02D 2300/0021 | . . . | Mortar [2013-01] |
E02D 2300/0023 | . . . | Slurry [2013-01] |
E02D 2300/0025 | . . | Adhesives, i.e. glues [2013-01] |
E02D 2300/0026 | . | Metals [2013-01] |
E02D 2300/0028 | . . | Copper [2013-01] |
E02D 2300/0029 | . . | Steel; Iron [2013-01] |
E02D 2300/0031 | . . . | in cast iron form [2013-01] |
E02D 2300/0032 | . . . | in sheet form, i.e. bent or deformed plate-material [2013-01] |
E02D 2300/0034 | . . . | in wire form [2013-01] |
E02D 2300/0035 | . . | Aluminium [2013-01] |
E02D 2300/0037 | . | Clays [2013-01] |
E02D 2300/0039 | . . | mixed with additives [2013-01] |
E02D 2300/004 | . . | Bentonite or bentonite-like [2013-01] |
E02D 2300/0042 | . . . | being modified by adding substances [2013-01] |
E02D 2300/0043 | . . . | with other ingredients [2013-01] |
E02D 2300/0045 | . | Composites [2013-01] |
E02D 2300/0046 | . | Foams [2013-01] |
E02D 2300/0048 | . . | PU [2013-01] |
E02D 2300/005 | . . | PE [2013-01] |
E02D 2300/0051 | . | Including fibers [2013-01] |
E02D 2300/0053 | . . | made from glass [2013-01] |
E02D 2300/0054 | . . | made from plastic [2013-01] |
E02D 2300/0056 | . . . | PVC [2013-01] |
E02D 2300/0057 | . . . | PE [2013-01] |
E02D 2300/0059 | . . . | PP [2013-01] |
E02D 2300/006 | . . . | being recycled [2013-01] |
E02D 2300/0062 | . . . . | Shredded car tires [2013-01] |
E02D 2300/0064 | . . | made from metal [2013-01] |
E02D 2300/0065 | . . | made from textile [2013-01] |
E02D 2300/0067 | . . | made from cellulose [2013-01] |
E02D 2300/0068 | . . | made from carbon [2013-01] |
E02D 2300/007 | . | Resins including glasfibers [2013-01] |
E02D 2300/0071 | . | Wood [2013-01] |
E02D 2300/0073 | . | Explosives [2013-01] |
E02D 2300/0075 | . | Textiles [2013-01] |
E02D 2300/0076 | . . | non-woven [2013-01] |
E02D 2300/0078 | . . | woven [2013-01] |
E02D 2300/0079 | . | Granulates [2013-01] |
E02D 2300/0081 | . | Ceramics [2013-01] |
E02D 2300/0082 | . | Cellulose [2013-01] |
E02D 2300/0084 | . | Geogrids [2013-01] |
E02D 2300/0085 | . | Geotextiles [2013-01] |
E02D 2300/0087 | . . | woven [2013-01] |
E02D 2300/0089 | . . | non-woven [2013-01] |
E02D 2300/009 | . . | with multi-layer structure [2013-01] |
E02D 2300/0092 | . . . | including a liquid tight layer [2013-01] |
E02D 2300/0093 | . . . . | including bentonite [2013-01] |
E02D 2300/0095 | . . . . | including a plastic membrane [2013-01] |
E02D 2300/0096 | . . | with external friction enhancement features [2013-01] |
E02D 2300/0098 | . | Bitumen [2013-01] |
E02D 2450/00 | Gaskets [2018-01] |
E02D 2450/10 | . | Membranes [2013-01] |
E02D 2450/101 | . . | permeable [2013-01] |
E02D 2450/102 | . . . | for liquids [2013-01] |
E02D 2450/103 | . . . | for gases [2013-01] |
E02D 2450/105 | . . | impermeable [2013-01] |
E02D 2450/106 | . . . | for liquids [2013-01] |
E02D 2450/107 | . . . | for gases [2013-01] |
E02D 2450/108 | . . | multi-layered [2013-01] |
E02D 2600/00 | Miscellaneous [2013-01] |
E02D 2600/10 | . | comprising sensor means [2013-01] |
E02D 2600/20 | . | comprising details of connection between elements [2013-01] |
E02D 2600/30 | . | comprising anchoring details [2013-01] |
E02D 2600/40 | . | comprising stabilising elements [2013-01] |