Version: 2025.01
Loading Scheme...
E02C 1/00 |
E02C 1/02 | . | with auxiliary basins [2013-01] |
E02C 1/04 | . | with floating throughs {throughs for inclined plane lifting apparatus} [2013-01] |
E02C 1/06 | . |
E02C 1/08 | . |
E02C 1/10 | . | Equipment for use in connection with the navigation of ships in locks; Mooring equipment (tying-up, anchoring waterborne vessels B63B 21/00; equipment for shipping on coasts, in harbours or on other fixed marine structures E02B 3/20) [2013-01] |
E02C 3/00 | Inclined-plane ship-lifting mechanisms {; Systems for conveying barges or lighters over land, e.g. by railway} [2023-08] |
E02C 5/00 |
E02C 5/02 | . | with floating chambers [2013-01] |