Symbol Origin— Symbols and Dates established
- Last updated
- Friday December 30, 2022
- Maintained by
- OIPC/Classification Standards and Development
The following is a list of all symbols which were added to the CPC Scheme. If available, the corresponding Project information is provided for the symbol. Please refer to the CPC Notices of Changes for additional information regarding changes to the Scheme, Definition, and Concordance.
Refer to the List of Deleted Symbols for all symbols which were added to the Scheme.
Note: In exceptional circumstances, symbol numbers may have been reused.
Update to CPC Project Numbering
As a result of system upgrades, as of the CPC 2022.05 release, the numbering system of CPC projects is changed from parallel numbering to serial numbering and an extra digit is added.
From 2013 to 2022.02, projects used a set of parallel numbering, e.g. RP0001, RP0002, MP0001, MP0002, DP0001, DP0002.
The new numbering is a single set of serial numbers with an extra leading digit, e.g. RP10001, DP10002, MP10003, MP10004, DP10005, RP10006 so that each project gets a unique number to eliminate any risk of confusion between projects of different types.
When finalising a project that was originally published with an old-style number, the old number is still used for convenience and clarity.
As a result of system upgrades, as of the CPC 2022.05 release, the numbering system of CPC projects is changed from parallel numbering to serial numbering and an extra digit is added.
From 2013 to 2022.02, projects used a set of parallel numbering, e.g. RP0001, RP0002, MP0001, MP0002, DP0001, DP0002.
The new numbering is a single set of serial numbers with an extra leading digit, e.g. RP10001, DP10002, MP10003, MP10004, DP10005, RP10006 so that each project gets a unique number to eliminate any risk of confusion between projects of different types.
When finalising a project that was originally published with an old-style number, the old number is still used for convenience and clarity.
Version: 2023.01
Loading table...
Symbol | Date Established | Project / NoC |
---|---|---|
A23L 13/75 | 2023.01 | RP11908 / 1378 |
A23L 13/77 | 2023.01 | RP11908 / 1378 |
B05B 11/01 | 2023.01 | RP11901 / 1376 |
B05B 11/026 | 2023.01 | RP11901 / 1376 |
B05B 11/027 | 2023.01 | RP11901 / 1376 |
B05B 11/028 | 2023.01 | RP11901 / 1376 |
B05B 11/029 | 2023.01 | RP11901 / 1376 |
B05B 11/10 | 2023.01 | RP11901 / 1376 |
B05B 11/1001 | 2023.01 | RP11901 / 1376 |
B05B 11/1002 | 2023.01 | RP11901 / 1376 |
B05B 11/1004 | 2023.01 | RP11901 / 1376 |
B05B 11/1005 | 2023.01 | RP11901 / 1376 |
B05B 11/1007 | 2023.01 | RP11901 / 1376 |
B05B 11/1008 | 2023.01 | RP11901 / 1376 |
B05B 11/1009 | 2023.01 | RP11901 / 1376 |
B05B 11/1011 | 2023.01 | RP11901 / 1376 |
B05B 11/1012 | 2023.01 | RP11901 / 1376 |
B05B 11/1014 | 2023.01 | RP11901 / 1376 |
B05B 11/1015 | 2023.01 | RP11901 / 1376 |
B05B 11/1016 | 2023.01 | RP11901 / 1376 |
B05B 11/1018 | 2023.01 | RP11901 / 1376 |
B05B 11/1019 | 2023.01 | RP11901 / 1376 |
B05B 11/1021 | 2023.01 | RP11901 / 1376 |
B05B 11/1022 | 2023.01 | RP11901 / 1376 |
B05B 11/1023 | 2023.01 | RP11901 / 1376 |
B05B 11/1025 | 2023.01 | RP11901 / 1376 |
B05B 11/1026 | 2023.01 | RP11901 / 1376 |
B05B 11/1028 | 2023.01 | RP11901 / 1376 |
B05B 11/1029 | 2023.01 | RP11901 / 1376 |
B05B 11/103 | 2023.01 | RP11901 / 1376 |
B05B 11/1032 | 2023.01 | RP11901 / 1376 |
B05B 11/1033 | 2023.01 | RP11901 / 1376 |
B05B 11/1035 | 2023.01 | RP11901 / 1376 |
B05B 11/1036 | 2023.01 | RP11901 / 1376 |
B05B 11/1038 | 2023.01 | RP11901 / 1376 |
B05B 11/1039 | 2023.01 | RP11901 / 1376 |
B05B 11/104 | 2023.01 | RP11901 / 1376 |
B05B 11/1042 | 2023.01 | RP11901 / 1376 |
B05B 11/1043 | 2023.01 | RP11901 / 1376 |
B05B 11/1045 | 2023.01 | RP11901 / 1376 |
B05B 11/1046 | 2023.01 | RP11901 / 1376 |
B05B 11/1047 | 2023.01 | RP11901 / 1376 |
B05B 11/1049 | 2023.01 | RP11901 / 1376 |
B05B 11/105 | 2023.01 | RP11901 / 1376 |
B05B 11/1052 | 2023.01 | RP11901 / 1376 |
B05B 11/1053 | 2023.01 | RP11901 / 1376 |
B05B 11/1054 | 2023.01 | RP11901 / 1376 |
B05B 11/1056 | 2023.01 | RP11901 / 1376 |
B05B 11/1057 | 2023.01 | RP11901 / 1376 |
B05B 11/1059 | 2023.01 | RP11901 / 1376 |
B05B 11/106 | 2023.01 | RP11901 / 1376 |
B05B 11/1061 | 2023.01 | RP11901 / 1376 |
B05B 11/1063 | 2023.01 | RP11901 / 1376 |
B05B 11/1064 | 2023.01 | RP11901 / 1376 |
B05B 11/1066 | 2023.01 | RP11901 / 1376 |
B05B 11/1067 | 2023.01 | RP11901 / 1376 |
B05B 11/1069 | 2023.01 | RP11901 / 1376 |
B05B 11/107 | 2023.01 | RP11901 / 1376 |
B05B 11/1071 | 2023.01 | RP11901 / 1376 |
B05B 11/1073 | 2023.01 | RP11901 / 1376 |
B05B 11/1074 | 2023.01 | RP11901 / 1376 |
B05B 11/1076 | 2023.01 | RP11901 / 1376 |
B05B 11/1077 | 2023.01 | RP11901 / 1376 |
B05B 11/1078 | 2023.01 | RP11901 / 1376 |
B05B 11/108 | 2023.01 | RP11901 / 1376 |
B05B 11/1081 | 2023.01 | RP11901 / 1376 |
B05B 11/1083 | 2023.01 | RP11901 / 1376 |
B05B 11/1084 | 2023.01 | RP11901 / 1376 |
B05B 11/1085 | 2023.01 | RP11901 / 1376 |
B05B 11/1087 | 2023.01 | RP11901 / 1376 |
B05B 11/1088 | 2023.01 | RP11901 / 1376 |
B05B 11/109 | 2023.01 | RP11901 / 1376 |
B05B 11/1091 | 2023.01 | RP11901 / 1376 |
B05B 11/1092 | 2023.01 | RP11901 / 1376 |
B05B 11/1094 | 2023.01 | RP11901 / 1376 |
B05B 11/1095 | 2023.01 | RP11901 / 1376 |
B05B 11/1097 | 2023.01 | RP11901 / 1376 |
B05B 11/1098 | 2023.01 | RP11901 / 1376 |
B64C 21/01 | 2023.01 | RP11903 / 1374 |
B64U | 2023.01 | RP11941 / 1379 |
B64U 10/00 | 2023.01 | RP11941 / 1379 |
B64U 10/10 | 2023.01 | RP11941 / 1379 |
B64U 10/11 | 2023.01 | RP11941 / 1379 |
B64U 10/13 | 2023.01 | RP11941 / 1379 |
B64U 10/14 | 2023.01 | RP11941 / 1379 |
B64U 10/16 | 2023.01 | RP11941 / 1379 |
B64U 10/17 | 2023.01 | RP11941 / 1379 |
B64U 10/20 | 2023.01 | RP11941 / 1379 |
B64U 10/25 | 2023.01 | RP11941 / 1379 |
B64U 10/30 | 2023.01 | RP11941 / 1379 |
B64U 10/40 | 2023.01 | RP11941 / 1379 |
B64U 10/50 | 2023.01 | RP11941 / 1379 |
B64U 10/60 | 2023.01 | RP11941 / 1379 |
B64U 10/70 | 2023.01 | RP11941 / 1379 |
B64U 10/80 | 2023.01 | RP11941 / 1379 |
B64U 20/00 | 2023.01 | RP11941 / 1379 |
B64U 20/10 | 2023.01 | RP11941 / 1379 |
B64U 20/20 | 2023.01 | RP11941 / 1379 |
B64U 20/30 | 2023.01 | RP11941 / 1379 |
B64U 20/40 | 2023.01 | RP11941 / 1379 |