CPC H04W 72/0446 (2013.01) [H04B 7/068 (2013.01); H04B 17/382 (2015.01); H04L 5/0091 (2013.01); H04L 27/26025 (2021.01); H04L 27/2666 (2013.01); H04W 56/001 (2013.01); H04W 56/002 (2013.01); H04W 72/04 (2013.01); H04W 76/15 (2018.02); H04L 1/1893 (2013.01); H04L 47/70 (2013.01); H04L 67/141 (2013.01); H04W 88/06 (2013.01)] | 17 Claims |
1. A user equipment comprising:
a transceiver; and
a processing circuitry coupled to the transceiver, the processing circuitry being configured to:
receive by Radio Resource Control (RRC) signaling:
first information indicating a parameter set regarding a Synchronization Signal (SS) and Physical Broadcast Channel (PBCH) in a New Radio (NR) cell,
wherein the parameter set regarding the SS and the PBCH comprises a subcarrier spacing common to the SS and the PBCH, and
second information indicating a predetermined starting resource of a plurality of resources in the NR cell that are successive in a frequency direction,
wherein the SS and the PBCH are transmitted in the successive plurality of resources in the NR cell; and
receive the SS and the PBCH in the NR cell based on the first information and the second information,
wherein the plurality of resources in the NR cell that are successive in the frequency direction where the SS and the PBCH are transmitted are successive resources decided based on the predetermined starting resource and are expressed as a number of multiple subcarriers in the frequency direction, and
wherein the SS includes a Primary Synchronization signal (PSS) and a Secondary Synchronization Signal (SSS).
|