US 11,753,986 B1
Methods and systems for turbocharger
Christopher Homison, Wattsburg, PA (US); Louis Kobielski, Sherman, NY (US); and Adam Felton, Grove City, PA (US)
Assigned to Transportation IP Holdings, LLC, Norwalk, CT (US)
Filed by Transportation IP Holdings, LLC, Norwalk, CT (US)
Filed on Jan. 30, 2023, as Appl. No. 18/161,595.
Claims priority of provisional application 63/268,399, filed on Feb. 23, 2022.
Int. Cl. F02B 37/24 (2006.01); F02B 37/013 (2006.01); F02B 37/18 (2006.01); F02B 37/16 (2006.01); F02B 37/00 (2006.01)
CPC F02B 37/24 (2013.01) [F02B 37/013 (2013.01); F02B 37/16 (2013.01); F02B 37/18 (2013.01); F02B 37/183 (2013.01); F02B 37/004 (2013.01)] 20 Claims
OG exemplary drawing
 
16. A system, comprising:
a first turbocharger fluidly coupled to a power source and to a second turbocharger, where the second turbocharger receives boost from the first turbocharger and flows boost to a nozzle of a first turbine of the first turbocharger.