US 11,703,827 B2
Industrial automation asset and control project analysis
Scott A Miller, Mayfield Heights, OH (US); Nathan Reynolds, Bonsall, CA (US); Christopher Wayne Como, Mayfield Heights, OH (US); Nathaniel S Sandler, Chagrin Falls, OH (US); Ryan P Dunn, Mayfield Heights, OH (US); Bruce T McCleave, Jr., Mission Viejo, CA (US); Kyle Reissner, Hudson, OH (US); and Stephen C Briant, Wexford, PA (US)
Assigned to Rockwell Automation Technologies, Inc., Mayfield Heights, OH (US)
Filed by Rockwell Automation Technologies, Inc., Mayfield Heights, OH (US)
Filed on Aug. 4, 2022, as Appl. No. 17/817,447.
Application 17/817,447 is a continuation of application No. 17/011,213, filed on Sep. 3, 2020, granted, now 11,449,028.
Prior Publication US 2022/0382248 A1, Dec. 1, 2022
Int. Cl. G05B 19/4093 (2006.01); G05B 19/418 (2006.01); G06Q 10/087 (2023.01)
CPC G05B 19/4093 (2013.01) [G05B 19/41885 (2013.01); G06Q 10/087 (2013.01); G05B 2219/31229 (2013.01)] 20 Claims
OG exemplary drawing
 
1. A system for analyzing industrial control projects, comprising:
a memory that stores executable components; and
a processor, operatively coupled to the memory, that executes the executable components, the executable components comprising:
a user interface component configured to receive, from a client device via a cloud platform, an industrial control project comprising at least control programming and device configuration data that, in response to execution on one or more industrial devices, facilitate monitoring and control of an industrial automation system;
a project telemetry component configured to generate project telemetry data based on an analysis of the industrial control project, the project telemetry data defining characteristics of the one or more industrial devices and predicted operating characteristics of the industrial control project inferred based on the analysis; and
a project analysis component configured to:
identify a device profile, of device profiles stored on a repository and respectively defining functional specifications for industrial assets provided by one or more equipment vendors, that corresponds to an industrial device of the one or more industrial device identified by the project telemetry data, and
generate, based on a comparison of the project telemetry data with the device profile, a recommendation for modifying the industrial control project in a manner that improves one or more of the predicted operating characteristics,
wherein the user interface component is configured to render the recommendation on the client device.