| US 7,500,521 B2 | ||
| Methods of enhancing uniform placement of a resin in a subterranean formation | ||
| Philip D. Nguyen, Duncan, Okla. (US); and Richard D. Rickman, Duncan, Okla. (US) | ||
| Assigned to Halliburton Energy Services, Inc., Duncan, Okla. (US) | ||
| Filed on Jul. 06, 2006, as Appl. No. 11/482,602. | ||
| Prior Publication US 2008/0006406 A1, Jan. 10, 2008 | ||
| Int. Cl. E21B 33/138 (2006.01); E21B 43/12 (2006.01) | ||
| U.S. Cl. 166—295 [166/300] | 19 Claims |
| 1. A method comprising:
introducing a preflush fluid comprising an oil-soluble diverting agent into a portion of a subterranean formation;
introducing a resin and an aqueous soluble diverting agent into at least a portion of the subterranean formation;
allowing the oil-soluble diverting agent to at least partially dissolve;
introducing an afterflush fluid comprising an oil soluble diverting agent into a portion of a subterranean formation; and
allowing the resin to at least partially consolidate at least a portion of the subterranean formation.
|