|
|
| Class Numbers & Titles | Class Numbers Only | USPC Index | International | HELP |
| You are viewing a USPC Schedule. |
Class 405 | HYDRAULIC AND EARTH ENGINEERING |
| Click here for a printable version of this file | |
| 1 | MARINE VESSEL PORTAGE, LAUNCHING, OR REMOVING |
| 8 | PRESSURIZED CAISSON |
| 11 | MEANS TO EXPOSE A NORMALLY WETTED SURFACE,E.G., COFFERDAM, ETC. |
| 12 | Contoured to wetted surface, e.g., side hung ship caisson |
| 13 | Having transport, placement, or dislodgement means |
| 14 | Connectable sections |
| 15 | BANK, SHORE, OR BED PROTECTION |
| 16 | Revetment |
| 21 | Wave or flow dissipation |
| 36 | DRAINAGE OR IRRIGATION |
| 37 | Control means responsive to sensed condition |
| 38 | Including subsurface moisture barrier |
| 39 | Having regulation of flow through channel |
| 42 | End cap |
| 43 | Porous or apertured pipe, flume, or tileway |
| 44 | Uniform discharge |
| 45 | Porous |
| 46 | Earthen bottom |
| 47 | Flow through joint |
| 48 | Open seam or shielded outlet |
| 49 | Corrugated |
| 50 | Porous waterway, e.g., sand drain, etc. |
| 51 | Branched flow |
| 52 | FLUID CONTROL, TREATMENT, OR CONTAINMENT |
| 53 | Fluid storage in earthen cavity |
| 54 | With indicator or alarm means |
| 55 | Cavity construction |
| 59 | Supply or recovery of stored fluid by separate fluid |
| 60 | Floatable matter containment |
| 73 | Erosive scouring |
| 74 | Settling of suspended matter in a specific location (e.g., at a scoured pier) |
| 75 | Extracting power from moving fluid |
| 79 | Wave generation or enhancement |
| 80 | Flow control |
| 81 | Fishway |
| 84 | Navigable canal |
| 87 | Water gate or adjustable weir |
| 88 | Center flow |
| 89 | Uniform discharge |
| 90 | Removable |
| 92 | Condition responsive |
| 98 | Roller or flexible |
| 99 | Swinging |
| 103 | Sliding |
| 107 | Artificial water barrier (e.g., dam, levee, etc.) |